10/15/16

Casita nearly enclosed


Front elevation, image shot from south. Underneath that tarp is about half of the roof foam and OSB; the other portion is inside the building. I buried the vigas in the parapet wall because neighbor Phil reminded this builder that as the vigas shrank and cracked there is no way to stop water from penetrating the adobe wall. Additional mortar will go into the viga bays, the adobes will be scrubbed and stucco applied.



Northeast elevation.




Northwest elevation. Some of the last adobes being laid are going between the vigas today. Progress development here, here, here and here.

2 comments:

  1. Kurtz Trading Post . . . . looking good there

    ReplyDelete
  2. Thanks, Duff; but it's destined to be an AirBnB for Our Lady of the Arroyo. The bad news is the PNM transmission line and Las Tres Hermanas is a trio of pylons on an easement that turn the line 90 degrees to avoid going across the Santo Domingo Pueblo. I have avoided including that in all the photos.

    ReplyDelete

Republican is simply another word for Earth hater but comments intended to troll the author or other readers will not be published so use a handle or even your real name and don’t be an asshole.